Tranquillity Manchester October 2024 Update

Welcome to the first-ever update on Tranquillity Manchester, the East Wing at Berkeley Square! Eight weeks in, and we’re thrilled to share what’s happening…

Harry Stuart
• 1 month ago
A photo of the Tranquillity Manchester development during the build phase

Welcome to the first-ever update on Tranquillity Manchester, the East Wing at Berkeley Square! Eight weeks in, and we’re thrilled to share what’s happening on-site as this exciting new part of the Berkeley Square development takes shape.

Progress So Far

Our main focus so far has been laying down a rock-solid foundation. It might not be the most glamorous stage, but it’s crucial for everything else to come. Here’s what’s been happening:

  • Foundation and Piling: We’ve been working on a deep foundation, with reinforced piling now complete across key areas. It’s all about ensuring stability from the ground up.
  • Tower Cranes: If you’ve passed by, you may have noticed the third crane rising up. It’s fully operational, with a fourth on the way, helping us move heavy materials more efficiently.
  • Waterproofing and Drainage: To keep the lower levels protected, we’re adding waterproofing and drainage systems. It’s the kind of work that may not be visible but makes all the difference in the building’s durability.

A photo of the Tranquillity Manchester development during the build phase

What’s Coming Next

With much of the groundwork wrapped up, we’re looking forward to kicking off the above-ground construction phase:

  • Foundation Wrap-Up and Core Columns: We’ll be completing foundation work in the coming weeks and installing the first columns on the lower floors, officially marking the start of vertical construction.
  • Structure Taking Shape: We’re preparing slip forms and core columns, and before long, Tranquillity Manchester will start to rise!

Utilities and Design Work

We’re making sure everything is set up for future residents by coordinating with utility providers for electricity, water, and telecom connections. At the same time, our design teams are enhancing the landscaping to create a seamless connection between Tranquillity Manchester and the lively Berkeley Square community.

Stay tuned for more updates.

Speak to us!

For more information on Tranquillity Manchester, check out our dedicated page:

Tranquillity Manchester

Feel free to contact us directly at:

01942 931300 // sales@heatongroup.co.uk // Schedule a Call

Latest Posts:
Tranquillity Manchester November 2024 Update
November 27, 2024
Berkeley Square Manchester November 2024 Update
November 27, 2024
Berkeley Square Manchester October 2024 Update
October 30, 2024
Berkeley Square September Update
September 24, 2024
Contact:

Investor Onboarding

Begin your journey to your next property investment. Lets get started.

Introduce yourself:
About your investments:

AS SEEN IN

*avg. investment yield 6.9%