{"id":5971,"date":"2024-11-27T14:15:22","date_gmt":"2024-11-27T14:15:22","guid":{"rendered":"https:\/\/heatongroup.co.uk\/?post_type=build-updates&#038;p=5971"},"modified":"2024-11-27T14:15:22","modified_gmt":"2024-11-27T14:15:22","slug":"berkeley-square-manchester-november-2024-update","status":"publish","type":"build-updates","link":"https:\/\/heatongroup.co.uk\/zh\/build-updates\/berkeley-square-manchester-november-2024-update\/","title":{"rendered":"Berkeley Square Manchester November 2024 Update"},"content":{"rendered":"\n<p>We\u2019re back with the latest news from <a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\"><em>Berkeley Square Manchester<\/em><\/a>! As we move into week 83 of 139, the project is progressing well, with the team still ahead of schedule and plenty to show for their efforts.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-s-been-happening\">What&#8217;s Been Happening?<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Structure and Fa\u00e7ade<\/strong>: The fa\u00e7ade work continues to progress, with insulation, render, and brick slips being installed. A cold snap slowed things down for a few days, but the team is back on track.<\/li>\n\n\n\n<li><strong>Inside the Building<\/strong>: Internal partitions are moving ahead on levels 2 through 5, and the first and second fix mechanical and electrical work is making excellent progress. On the ground floor, finishes such as flooring, kitchens, tiling, and decoration are shaping up nicely.<\/li>\n\n\n\n<li><strong>Lifts and Power<\/strong>: The lift installation in core 3 is now complete, and work on lift 2 in core 1 is well underway. Mains cables have been installed to the lower ground floor risers, and while we\u2019re still waiting for permanent power (due in March 2025), temporary lighting solutions are keeping the apartments well-lit.<\/li>\n\n\n\n<li><strong>Benchmark Apartment<\/strong>: The benchmark apartment has been fully decorated and is now undergoing snagging to ensure it meets our high standards.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"660\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24-Outside-view-1024x660.jpg\" alt=\"\" class=\"wp-image-5973\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24-Outside-view-1024x660.jpg 1024w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24-Outside-view-300x193.jpg 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24-Outside-view-768x495.jpg 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24-Outside-view-18x12.jpg 18w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24-Outside-view.jpg 1337w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-s-coming-next\">What&#8217;s Coming Next<\/h2>\n\n\n\n<p>Looking ahead, the team will focus on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Continuing the brick slip fa\u00e7ade and insulation work.<\/li>\n\n\n\n<li>Advancing the fit-out of apartments on levels 0 through 2, including flooring, kitchens, and joinery.<\/li>\n\n\n\n<li>Starting lift installation in core 2.<\/li>\n\n\n\n<li>Commencing the fit-out of the substation.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-utilities-and-design-progress\">Utilities and Design Progress<\/h2>\n\n\n\n<p>The substation shell has been handed over for fit-out, and 80% of the off-site duct installation for electricity is complete. On the design side, updates to roof details and ceiling plans are nearly finalised, with a landscaping plan set to be submitted by the end of December.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Health, Safety, and Quality<\/h3>\n\n\n\n<p>With around 190 operatives on site daily, it\u2019s been another safe month with no reportable accidents. Quality inspections continue across all trades, and fire safety measures are being carefully tracked.<\/p>\n\n\n\n<p><strong>Stay tuned for more updates.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-center\" id=\"h-speak-to-us\">Speak to us!<\/h4>\n\n\n\n<p class=\"has-text-align-center\">For more information on <a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Berkeley Square Manchester<\/a>, check out our dedicated page:<br><br><a href=\"https:\/\/heatongroup.co.uk\/developments\/tranquillity-manchester\/\"><\/a><a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Berkeley Square Manchester<\/a><\/p>\n\n\n\n<p class=\"has-text-align-center\">Feel free to contact us directly at:<\/p>\n\n\n\n<p class=\"has-text-align-center\">01942 931300&nbsp;\/\/<a href=\"mailto:sales@heatongroup.co.uk\">&nbsp;sales@heatongroup.co.uk<\/a>&nbsp;\/\/ <a href=\"https:\/\/meetings.hubspot.com\/maxine-mitchell\/schedule-call\">Schedule a Call<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We\u2019re back with the latest news from Berkeley Square Manchester! As we move into week 83 of 139, the project is progressing well, with the team still ahead of schedule and plenty to show for their efforts. What&#8217;s Been Happening? What&#8217;s Coming Next Looking ahead, the team will focus on: Utilities and Design Progress The [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":5972,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"content-type":"","footnotes":""},"class_list":["post-5971","build-updates","type-build-updates","status-publish","format-standard","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3.1 (Yoast SEO v25.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Berkeley Square Manchester November 2024 Update | The Heaton Group<\/title>\n<meta name=\"description\" content=\"Get the latest construction updates on Berkeley Square Manchester, including progress highlights and upcoming milestones.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/heatongroup.co.uk\/zh\/build-updates\/berkeley-square-manchester-november-2024-update\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Berkeley Square Manchester November 2024 Update\" \/>\n<meta property=\"og:description\" content=\"Get the latest construction updates on Berkeley Square Manchester, including progress highlights and upcoming milestones.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/heatongroup.co.uk\/zh\/build-updates\/berkeley-square-manchester-november-2024-update\/\" \/>\n<meta property=\"og:site_name\" content=\"Property Development &amp; Buy to Let Property | The Heaton Group\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/theheatongroup\" \/>\n<meta property=\"og:image\" content=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1379\" \/>\n\t<meta property=\"og:image:height\" content=\"1033\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@theheatongroup\" \/>\n<meta name=\"twitter:label1\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/\",\"url\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/\",\"name\":\"Berkeley Square Manchester November 2024 Update | The Heaton Group\",\"isPartOf\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24.jpg\",\"datePublished\":\"2024-11-27T14:15:22+00:00\",\"description\":\"Get the latest construction updates on Berkeley Square Manchester, including progress highlights and upcoming milestones.\",\"breadcrumb\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#breadcrumb\"},\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#primaryimage\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24.jpg\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24.jpg\",\"width\":1379,\"height\":1033,\"caption\":\"Berkeley Square Manchester Build Update Nov 24\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/heatongroup.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Build Updates\",\"item\":\"https:\/\/heatongroup.co.uk\/build-updates\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Berkeley Square Manchester November 2024 Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/heatongroup.co.uk\/#website\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"name\":\"Heaton Group\",\"description\":\"Property Development &amp; Buy to Let Property\",\"publisher\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/heatongroup.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\",\"name\":\"The Heaton Group\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"width\":716,\"height\":895,\"caption\":\"The Heaton Group\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/theheatongroup\",\"https:\/\/x.com\/theheatongroup\",\"https:\/\/www.instagram.com\/theheatongroup\/\",\"https:\/\/www.tiktok.com\/@heaton.group\",\"https:\/\/www.linkedin.com\/company\/heaton-group\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Berkeley Square Manchester November 2024 Update | The Heaton Group","description":"Get the latest construction updates on Berkeley Square Manchester, including progress highlights and upcoming milestones.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/heatongroup.co.uk\/zh\/build-updates\/berkeley-square-manchester-november-2024-update\/","og_locale":"zh_CN","og_type":"article","og_title":"Berkeley Square Manchester November 2024 Update","og_description":"Get the latest construction updates on Berkeley Square Manchester, including progress highlights and upcoming milestones.","og_url":"https:\/\/heatongroup.co.uk\/zh\/build-updates\/berkeley-square-manchester-november-2024-update\/","og_site_name":"Property Development &amp; Buy to Let Property | The Heaton Group","article_publisher":"https:\/\/www.facebook.com\/theheatongroup","og_image":[{"width":1379,"height":1033,"url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@theheatongroup","twitter_misc":{"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"2 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/","url":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/","name":"Berkeley Square Manchester November 2024 Update | The Heaton Group","isPartOf":{"@id":"https:\/\/heatongroup.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#primaryimage"},"image":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#primaryimage"},"thumbnailUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24.jpg","datePublished":"2024-11-27T14:15:22+00:00","description":"Get the latest construction updates on Berkeley Square Manchester, including progress highlights and upcoming milestones.","breadcrumb":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#breadcrumb"},"inLanguage":"zh-Hans","potentialAction":[{"@type":"ReadAction","target":["https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/"]}]},{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#primaryimage","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24.jpg","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/11\/Berkeley-Square-Manchester-Build-Update-Nov-24.jpg","width":1379,"height":1033,"caption":"Berkeley Square Manchester Build Update Nov 24"},{"@type":"BreadcrumbList","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-manchester-november-2024-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/heatongroup.co.uk\/"},{"@type":"ListItem","position":2,"name":"Build Updates","item":"https:\/\/heatongroup.co.uk\/build-updates\/"},{"@type":"ListItem","position":3,"name":"Berkeley Square Manchester November 2024 Update"}]},{"@type":"WebSite","@id":"https:\/\/heatongroup.co.uk\/#website","url":"https:\/\/heatongroup.co.uk\/","name":"Heaton Group","description":"Property Development &amp; Buy to Let Property","publisher":{"@id":"https:\/\/heatongroup.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/heatongroup.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-Hans"},{"@type":"Organization","@id":"https:\/\/heatongroup.co.uk\/#organization","name":"The Heaton Group","url":"https:\/\/heatongroup.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","width":716,"height":895,"caption":"The Heaton Group"},"image":{"@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/theheatongroup","https:\/\/x.com\/theheatongroup","https:\/\/www.instagram.com\/theheatongroup\/","https:\/\/www.tiktok.com\/@heaton.group","https:\/\/www.linkedin.com\/company\/heaton-group"]}]}},"_links":{"self":[{"href":"https:\/\/heatongroup.co.uk\/zh\/wp-json\/wp\/v2\/build-updates\/5971","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heatongroup.co.uk\/zh\/wp-json\/wp\/v2\/build-updates"}],"about":[{"href":"https:\/\/heatongroup.co.uk\/zh\/wp-json\/wp\/v2\/types\/build-updates"}],"author":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/zh\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/zh\/wp-json\/wp\/v2\/comments?post=5971"}],"version-history":[{"count":1,"href":"https:\/\/heatongroup.co.uk\/zh\/wp-json\/wp\/v2\/build-updates\/5971\/revisions"}],"predecessor-version":[{"id":5974,"href":"https:\/\/heatongroup.co.uk\/zh\/wp-json\/wp\/v2\/build-updates\/5971\/revisions\/5974"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/zh\/wp-json\/wp\/v2\/media\/5972"}],"wp:attachment":[{"href":"https:\/\/heatongroup.co.uk\/zh\/wp-json\/wp\/v2\/media?parent=5971"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}