{"id":7035,"date":"2026-02-09T13:00:37","date_gmt":"2026-02-09T13:00:37","guid":{"rendered":"https:\/\/heatongroup.co.uk\/?post_type=build-updates&#038;p=7035"},"modified":"2026-02-09T13:00:38","modified_gmt":"2026-02-09T13:00:38","slug":"tranquillity-january-2026-update","status":"publish","type":"build-updates","link":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-january-2026-update\/","title":{"rendered":"Tranquillity January 2026 Update"},"content":{"rendered":"\n<p><em>Tranquillity continues to make outstanding progress on Ordsall Lane, maintaining its position nine weeks ahead of programme. With the fa\u00e7ade and roofing works now 99.9% watertight and internal fit-out activities advancing steadily across multiple levels, the development is moving confidently towarTranquillity continues to progress strongly into the new year and is currently nine weeks ahead of programme. With the building envelope almost fully complete and internal fit-out and commissioning advancing across multiple levels, the development is moving confidently through its next phase towards its planned completion in October 2026.d its completion phase.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-s-been-happening\">What&#8217;s Been Happening<\/h2>\n\n\n\n<p><strong>Fa\u00e7ade and Roofing:<\/strong><br>The fa\u00e7ade and roofs are now 99.9% watertight, with all SFS and boarding complete and windows installed throughout. Insulation, render, and brick slips have progressed across most areas of the fa\u00e7ade, with four mast climbers stripped to date as completed elevations are handed over.<\/p>\n\n\n\n<p><strong>Internal Works:<\/strong><br>Internal partitions have progressed through levels 4 to 8. Apartment fit-out continues on levels 2 and 3, including first coat painting, flooring, wall and floor tiling, joinery, and kitchen installations. Final decoration and final fix joinery have progressed to the ground floor apartments.<\/p>\n\n\n\n<p><strong>M&amp;E and Commissioning:<\/strong><br>M&amp;E ducting installations have advanced to levels 7 and 8, with water and sprinkler pipework reaching level 5 corridors. SVPs and cable containment to corridors are now complete. First fix M&amp;E continues on apartments at levels 4 and 5, while second fix has progressed to level 2 with lighting live. Water and electrical commissioning has been completed to the ground floor, ahead of decoration.<\/p>\n\n\n\n<p><strong>Lifts and Services:<\/strong><br>The second lift installation has been completed, with the third lift now underway. Works continue to the lower ground floor and LV room. Electric meters have been installed from levels 0 to 3 and are progressing upwards in line with fit-out. Temporary heating remains in place and connected to permanent power supplies.<\/p>\n\n\n\n<p><strong>Testing and Quality:<br><\/strong>Air testing has now been completed on forty apartments, achieving an improved average score of 3.10, demonstrating strong airtightness performance.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1379\" height=\"776\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg\" alt=\"\" class=\"wp-image-7036\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg 1379w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1-300x169.jpg 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1-1024x576.jpg 1024w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1-768x432.jpg 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1-18x10.jpg 18w\" sizes=\"(max-width: 1379px) 100vw, 1379px\" \/><figcaption class=\"wp-element-caption\"><em>Drone Image<\/em><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img decoding=\"async\" width=\"1024\" height=\"706\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture2-1024x706.jpg\" alt=\"\" class=\"wp-image-7037\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture2-1024x706.jpg 1024w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture2-300x207.jpg 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture2-768x530.jpg 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture2-18x12.jpg 18w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture2.jpg 1322w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Ordsall Road Elevation<\/em><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-s-coming-up\">What&#8217;s Coming Up<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Brick slip installation, fa\u00e7ade cleaning, and window cill works as mast climbers are dismantled.<\/em><\/li>\n\n\n\n<li><em>Progress fa\u00e7ade completion on the north elevation.<\/em><\/li>\n\n\n\n<li><em>Continue internal partitions and M&amp;E first fix to apartments, corridors, and stairwells.<\/em><\/li>\n\n\n\n<li><em>Apartment fit-out continues, including final decoration, joinery, and fittings.<\/em><\/li>\n\n\n\n<li><em>Board ground and first-floor corridor ceilings.<\/em><\/li>\n\n\n\n<li><em>Begin final decoration to apartments following M&amp;E commissioning.<\/em><\/li>\n\n\n\n<li><em>Commence plumbing commissioning and bring water on to apartments.<\/em><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-design-amp-quality\">Design &amp; Quality<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Continue brick slip installation, fa\u00e7ade cleaning, window cills, and mast climber dismantling, with works progressing to the north elevation.<\/em><\/li>\n\n\n\n<li><em>Continue internal partitions and M&amp;E first fix to apartments, corridors, and stairwells.<\/em><\/li>\n\n\n\n<li><em>Continue apartment fit-out and commissioning works ahead of decoration.<\/em><\/li>\n\n\n\n<li><em>Progress corridor ceiling boarding to upper levels.<\/em><\/li>\n\n\n\n<li><em>Commence apartment cleaning and snagging.<\/em><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-design-amp-quality-0\">Design &amp; Quality<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Ongoing design coordination continues.<\/em><\/li>\n\n\n\n<li><em>Lower ground floor GA plans have been updated to reflect communal area changes.<\/em><\/li>\n\n\n\n<li><em>The Building Control design tracker confirms all items are now closed.<\/em><\/li>\n\n\n\n<li><em>Planning conditions remain discharged except for further verification required at Phase 2 completion, relating to Conditions 5 (Remediation), 10 (Noise Attenuation), and 25 (Site Access and Servicing).<\/em><\/li>\n\n\n\n<li><em>NMA 2 has been formally discharged.<\/em><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-looking-ahead\">Looking Ahead<\/h2>\n\n\n\n<p>As fa\u00e7ade works near completion and internal fit-out accelerates across higher levels, Tranquillity continues to move into its final delivery stages with confidence. Ongoing commissioning, decoration, and snagging activities will ensure the development remains firmly ahead of programme, maintaining momentum toward the delivery of high-quality apartments in Manchester.<\/p>\n\n\n\n<p><strong>Stay tuned for more updates.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-center\" id=\"h-speak-to-us\">Speak to us!<\/h4>\n\n\n\n<p class=\"has-text-align-center\">For more information on <a href=\"https:\/\/heatongroup.co.uk\/developments\/tranquillity\/\">Tranquillity Manchester<\/a>, check out our dedicated page:<br><br><a href=\"https:\/\/heatongroup.co.uk\/developments\/tranquillity-manchester\/\"><\/a><a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Tranquillity Manchester<\/a><\/p>\n\n\n\n<p class=\"has-text-align-center\">Feel free to contact us directly at:<\/p>\n\n\n\n<p class=\"has-text-align-center\">01942 931300&nbsp;\/\/<a href=\"mailto:sales@heatongroup.co.uk\">&nbsp;sales@heatongroup.co.uk<\/a>&nbsp;\/\/ <a href=\"https:\/\/meetings.hubspot.com\/robert-herring\/investment-team-scheduler\">Schedule a Call<\/a> \/\/ <a href=\"https:\/\/meetings.hubspot.com\/robert-herring\/berkeley-square-visit\">Book a Viewing<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tranquillity continues to make outstanding progress on Ordsall Lane, maintaining its position nine weeks ahead of programme. With the fa\u00e7ade and roofing works now 99.9% watertight and internal fit-out activities advancing steadily across multiple levels, the development is moving confidently towarTranquillity continues to progress strongly into the new year and is currently nine weeks ahead [&hellip;]<\/p>\n","protected":false},"author":18,"featured_media":7036,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"content-type":"","footnotes":""},"class_list":["post-7035","build-updates","type-build-updates","status-publish","format-standard","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3.1 (Yoast SEO v25.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Tranquillity January 2026 Update | The Heaton Group<\/title>\n<meta name=\"description\" content=\"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-january-2026-update\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tranquillity January 2026 Update\" \/>\n<meta property=\"og:description\" content=\"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-january-2026-update\/\" \/>\n<meta property=\"og:site_name\" content=\"Property Development &amp; Buy to Let Property | The Heaton Group\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/theheatongroup\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-09T13:00:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1379\" \/>\n\t<meta property=\"og:image:height\" content=\"776\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@theheatongroup\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/\",\"url\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/\",\"name\":\"Tranquillity January 2026 Update | The Heaton Group\",\"isPartOf\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg\",\"datePublished\":\"2026-02-09T13:00:37+00:00\",\"dateModified\":\"2026-02-09T13:00:38+00:00\",\"description\":\"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.\",\"breadcrumb\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#primaryimage\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg\",\"width\":1379,\"height\":776},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/heatongroup.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Build Updates\",\"item\":\"https:\/\/heatongroup.co.uk\/build-updates\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tranquillity January 2026 Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/heatongroup.co.uk\/#website\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"name\":\"Heaton Group\",\"description\":\"Property Development &amp; Buy to Let Property\",\"publisher\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/heatongroup.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\",\"name\":\"The Heaton Group\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"width\":716,\"height\":895,\"caption\":\"The Heaton Group\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/theheatongroup\",\"https:\/\/x.com\/theheatongroup\",\"https:\/\/www.instagram.com\/theheatongroup\/\",\"https:\/\/www.tiktok.com\/@heaton.group\",\"https:\/\/www.linkedin.com\/company\/heaton-group\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tranquillity January 2026 Update | The Heaton Group","description":"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-january-2026-update\/","og_locale":"ar_AR","og_type":"article","og_title":"Tranquillity January 2026 Update","og_description":"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.","og_url":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-january-2026-update\/","og_site_name":"Property Development &amp; Buy to Let Property | The Heaton Group","article_publisher":"https:\/\/www.facebook.com\/theheatongroup","article_modified_time":"2026-02-09T13:00:38+00:00","og_image":[{"width":1379,"height":776,"url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@theheatongroup","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"4 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/","url":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/","name":"Tranquillity January 2026 Update | The Heaton Group","isPartOf":{"@id":"https:\/\/heatongroup.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#primaryimage"},"image":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#primaryimage"},"thumbnailUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg","datePublished":"2026-02-09T13:00:37+00:00","dateModified":"2026-02-09T13:00:38+00:00","description":"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.","breadcrumb":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#primaryimage","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2026\/02\/Picture1.jpg","width":1379,"height":776},{"@type":"BreadcrumbList","@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-january-2026-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/heatongroup.co.uk\/"},{"@type":"ListItem","position":2,"name":"Build Updates","item":"https:\/\/heatongroup.co.uk\/build-updates\/"},{"@type":"ListItem","position":3,"name":"Tranquillity January 2026 Update"}]},{"@type":"WebSite","@id":"https:\/\/heatongroup.co.uk\/#website","url":"https:\/\/heatongroup.co.uk\/","name":"Heaton Group","description":"Property Development &amp; Buy to Let Property","publisher":{"@id":"https:\/\/heatongroup.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/heatongroup.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/heatongroup.co.uk\/#organization","name":"The Heaton Group","url":"https:\/\/heatongroup.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","width":716,"height":895,"caption":"The Heaton Group"},"image":{"@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/theheatongroup","https:\/\/x.com\/theheatongroup","https:\/\/www.instagram.com\/theheatongroup\/","https:\/\/www.tiktok.com\/@heaton.group","https:\/\/www.linkedin.com\/company\/heaton-group"]}]}},"_links":{"self":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/7035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates"}],"about":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/types\/build-updates"}],"author":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/comments?post=7035"}],"version-history":[{"count":1,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/7035\/revisions"}],"predecessor-version":[{"id":7038,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/7035\/revisions\/7038"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media\/7036"}],"wp:attachment":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media?parent=7035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}