{"id":7007,"date":"2025-12-01T10:56:33","date_gmt":"2025-12-01T10:56:33","guid":{"rendered":"https:\/\/heatongroup.co.uk\/?post_type=build-updates&#038;p=7007"},"modified":"2025-12-01T10:56:33","modified_gmt":"2025-12-01T10:56:33","slug":"tranquillity-november-2025-update","status":"publish","type":"build-updates","link":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-november-2025-update\/","title":{"rendered":"Tranquillity November 2025 Update"},"content":{"rendered":"\n<p><em>Tranquillity continues to make outstanding progress on Ordsall Lane, maintaining its position nine weeks ahead of programme. With the fa\u00e7ade and roofing works now 99.9% watertight and internal fit-out activities advancing steadily across multiple levels, the development is moving confidently toward its completion phase.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-s-been-happening\">What&#8217;s Been Happening<\/h2>\n\n\n\n<p><strong>Fa\u00e7ade and Roofing:<\/strong> The building envelope is now virtually watertight, with all SFS and boarding to the facades complete and windows fully installed. Insulation, render, and brick slips have progressed across the southern elevation, and mast climbers have begun to be stripped in these completed areas.<\/p>\n\n\n\n<p><strong>M&amp;E and Services:<\/strong> Internal M&amp;E works have advanced, with ducting installations up to levels 6 and 7, and water and sprinkler pipework reaching the level 4 corridors. Second fix M&amp;E has progressed to the ground and first floors, where lighting has been commissioned. Electric meters have been fitted up to level 2.<\/p>\n\n\n\n<p><strong>Internal Works:<\/strong> Internal partitions are progressing well on levels 3 to 6, while first fix M&amp;E to apartments continues on levels 3 and 4. Fit-out activities such as paintwork, flooring, tiling, joinery, and kitchen installations have continued on the lower levels.<\/p>\n\n\n\n<p><strong>Lifts and Power:<\/strong> The first lift installation is complete, with work on the second lift now underway. Electric supplies are live throughout, allowing for temporary heating to be connected as the weather cools.<strong>Testing and Quality:<\/strong> Air tests have been carried out on the first ten apartments, achieving an average result of 3.45, confirming strong airtightness performance.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"939\" height=\"602\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png\" alt=\"\" class=\"wp-image-7003\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png 939w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1-300x192.png 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1-768x492.png 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1-18x12.png 18w\" sizes=\"(max-width: 939px) 100vw, 939px\" \/><figcaption class=\"wp-element-caption\"><em>South Terrace<\/em><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img decoding=\"async\" width=\"1024\" height=\"675\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity-3-1024x675.jpg\" alt=\"\" class=\"wp-image-7004\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity-3-1024x675.jpg 1024w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity-3-300x198.jpg 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity-3-768x507.jpg 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity-3-18x12.jpg 18w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity-3.jpg 1351w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Obelisk Way Elevation<\/em><\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-s-coming-up\">What&#8217;s Coming Up<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Brick slip installation, fa\u00e7ade cleaning, and window cill works as mast climbers are dismantled.<\/em><\/li>\n\n\n\n<li><em>Progress fa\u00e7ade completion on the north elevation.<\/em><\/li>\n\n\n\n<li><em>Continue internal partitions and M&amp;E first fix to apartments, corridors, and stairwells.<\/em><\/li>\n\n\n\n<li><em>Apartment fit-out continues, including final decoration, joinery, and fittings.<\/em><\/li>\n\n\n\n<li><em>Board ground and first-floor corridor ceilings.<\/em><\/li>\n\n\n\n<li><em>Begin final decoration to apartments following M&amp;E commissioning.<\/em><\/li>\n\n\n\n<li><em>Commence plumbing commissioning and bring water on to apartments.<\/em><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-design-amp-quality\">Design &amp; Quality<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Comments and design updates continue to be managed through the design tracker, with all Building Control items now closed.<\/em><\/li>\n\n\n\n<li><em>All planning conditions have been discharged except those requiring further verification at Phase 2 completion \u2014 specifically Conditions 5 (Remediation), 10 (Noise Attenuation), and 25 (Site Access and Servicing).<\/em><\/li>\n\n\n\n<li><em>Ongoing QA inspections and test reports continue to confirm strong progress and compliance across all trades.<\/em><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-health-amp-safety\">Health &amp; Safety<\/h2>\n\n\n\n<p>Site Workforce: An average of 180 operatives were on site daily, peaking at 198 during the month.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-looking-ahead\">Looking Ahead<\/h2>\n\n\n\n<p>With the fa\u00e7ade nearing completion and interior fit-out works advancing through multiple levels, Tranquillity is entering a visible stage of refinement. Continued progress across M&amp;E, joinery, and decoration will bring the building closer to its finished form, keeping the project firmly on track for timely, high-quality delivery.<\/p>\n\n\n\n<p><strong>Stay tuned for more updates.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-center\" id=\"h-speak-to-us\">Speak to us!<\/h4>\n\n\n\n<p class=\"has-text-align-center\">For more information on <a href=\"https:\/\/heatongroup.co.uk\/developments\/tranquillity\/\">Tranquillity Manchester<\/a>, check out our dedicated page:<br><br><a href=\"https:\/\/heatongroup.co.uk\/developments\/tranquillity-manchester\/\"><\/a><a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Tranquillity Manchester<\/a><\/p>\n\n\n\n<p class=\"has-text-align-center\">Feel free to contact us directly at:<\/p>\n\n\n\n<p class=\"has-text-align-center\">01942 931300&nbsp;\/\/<a href=\"mailto:sales@heatongroup.co.uk\">&nbsp;sales@heatongroup.co.uk<\/a>&nbsp;\/\/ <a href=\"https:\/\/meetings.hubspot.com\/robert-herring\/investment-team-scheduler\">Schedule a Call<\/a> \/\/ <a href=\"https:\/\/meetings.hubspot.com\/robert-herring\/berkeley-square-visit\">Book a Viewing<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tranquillity continues to make outstanding progress on Ordsall Lane, maintaining its position nine weeks ahead of programme. With the fa\u00e7ade and roofing works now 99.9% watertight and internal fit-out activities advancing steadily across multiple levels, the development is moving confidently toward its completion phase. What&#8217;s Been Happening Fa\u00e7ade and Roofing: The building envelope is now [&hellip;]<\/p>\n","protected":false},"author":18,"featured_media":7003,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"content-type":"","footnotes":""},"class_list":["post-7007","build-updates","type-build-updates","status-publish","format-standard","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3.1 (Yoast SEO v25.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Tranquillity November 2025 Update | The Heaton Group<\/title>\n<meta name=\"description\" content=\"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-november-2025-update\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tranquillity November 2025 Update\" \/>\n<meta property=\"og:description\" content=\"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-november-2025-update\/\" \/>\n<meta property=\"og:site_name\" content=\"Property Development &amp; Buy to Let Property | The Heaton Group\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/theheatongroup\" \/>\n<meta property=\"og:image\" content=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"939\" \/>\n\t<meta property=\"og:image:height\" content=\"602\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@theheatongroup\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/\",\"url\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/\",\"name\":\"Tranquillity November 2025 Update | The Heaton Group\",\"isPartOf\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png\",\"datePublished\":\"2025-12-01T10:56:33+00:00\",\"description\":\"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.\",\"breadcrumb\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#primaryimage\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png\",\"width\":939,\"height\":602},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/heatongroup.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Build Updates\",\"item\":\"https:\/\/heatongroup.co.uk\/build-updates\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tranquillity November 2025 Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/heatongroup.co.uk\/#website\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"name\":\"Heaton Group\",\"description\":\"Property Development &amp; Buy to Let Property\",\"publisher\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/heatongroup.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\",\"name\":\"The Heaton Group\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"width\":716,\"height\":895,\"caption\":\"The Heaton Group\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/theheatongroup\",\"https:\/\/x.com\/theheatongroup\",\"https:\/\/www.instagram.com\/theheatongroup\/\",\"https:\/\/www.tiktok.com\/@heaton.group\",\"https:\/\/www.linkedin.com\/company\/heaton-group\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tranquillity November 2025 Update | The Heaton Group","description":"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-november-2025-update\/","og_locale":"ar_AR","og_type":"article","og_title":"Tranquillity November 2025 Update","og_description":"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.","og_url":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/tranquillity-november-2025-update\/","og_site_name":"Property Development &amp; Buy to Let Property | The Heaton Group","article_publisher":"https:\/\/www.facebook.com\/theheatongroup","og_image":[{"width":939,"height":602,"url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@theheatongroup","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"3 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/","url":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/","name":"Tranquillity November 2025 Update | The Heaton Group","isPartOf":{"@id":"https:\/\/heatongroup.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#primaryimage"},"image":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#primaryimage"},"thumbnailUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png","datePublished":"2025-12-01T10:56:33+00:00","description":"Tranquillity continues to make exceptional progress on Ordsall Lane, now nine weeks ahead of programme.","breadcrumb":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#primaryimage","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/12\/Tranquillity1.png","width":939,"height":602},{"@type":"BreadcrumbList","@id":"https:\/\/heatongroup.co.uk\/build-updates\/tranquillity-november-2025-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/heatongroup.co.uk\/"},{"@type":"ListItem","position":2,"name":"Build Updates","item":"https:\/\/heatongroup.co.uk\/build-updates\/"},{"@type":"ListItem","position":3,"name":"Tranquillity November 2025 Update"}]},{"@type":"WebSite","@id":"https:\/\/heatongroup.co.uk\/#website","url":"https:\/\/heatongroup.co.uk\/","name":"Heaton Group","description":"Property Development &amp; Buy to Let Property","publisher":{"@id":"https:\/\/heatongroup.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/heatongroup.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/heatongroup.co.uk\/#organization","name":"The Heaton Group","url":"https:\/\/heatongroup.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","width":716,"height":895,"caption":"The Heaton Group"},"image":{"@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/theheatongroup","https:\/\/x.com\/theheatongroup","https:\/\/www.instagram.com\/theheatongroup\/","https:\/\/www.tiktok.com\/@heaton.group","https:\/\/www.linkedin.com\/company\/heaton-group"]}]}},"_links":{"self":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/7007","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates"}],"about":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/types\/build-updates"}],"author":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/comments?post=7007"}],"version-history":[{"count":1,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/7007\/revisions"}],"predecessor-version":[{"id":7008,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/7007\/revisions\/7008"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media\/7003"}],"wp:attachment":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media?parent=7007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}