{"id":6615,"date":"2025-04-23T15:52:49","date_gmt":"2025-04-23T14:52:49","guid":{"rendered":"https:\/\/heatongroup.co.uk\/?post_type=build-updates&#038;p=6615"},"modified":"2025-04-28T13:23:57","modified_gmt":"2025-04-28T12:23:57","slug":"berkeley-square-april-2025-update","status":"publish","type":"build-updates","link":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-april-2025-update\/","title":{"rendered":"Berkeley Square April 2025 Update"},"content":{"rendered":"\n<p><em>April has seen steady progress across <a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Berkeley Square Manchester<\/a>, with the team keeping things on track and five weeks ahead of schedule. While some external challenges have pushed back the power connection, plenty of work is being completed inside and out.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-s-been-happening\">What&#8217;s Been Happening<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Fa\u00e7ade and External Work<\/strong>: The brick slip system is progressing well across all elevations. As sections are finished, they\u2019re being handed over for window cills, mastic works, and Juliette balcony installations. Mast climber removal has also begun, making way for scaffolding to come down soon.<\/li>\n\n\n\n<li><strong>Internal Progress: <\/strong>\n<ul class=\"wp-block-list\">\n<li>Partitions are moving ahead on levels 6 to 8.<\/li>\n\n\n\n<li>MEP second and final fixes have reached level 4, with first fixes complete up to level 8.<\/li>\n\n\n\n<li>Floor finishes and painting are underway on level 6, while kitchens, tiling, and joinery are progressing on level 5.<\/li>\n\n\n\n<li>Level 4 apartments are being final decorated, and snagging continues on level 1. So far, 38 apartments are fully complete and ready for inspection.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Lifts and Utilities<\/strong>: All lifts are installed and commissioning has started. Water is now live, but due to off-site delays\u2014including a surprise discovery of a redundant rail tunnel\u2014the permanent power connection is now expected by early August.<\/li>\n\n\n\n<li><strong>Testing and Compliance<\/strong>: Air tests for 59 apartments have all passed, maintaining a strong average of 2.72. Acoustic testing is halfway complete, with excellent feedback on build quality.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"April 2025 Update | Berkeley Square Manchester | The Heaton Group\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/hpE3x5bfWEs?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-s-next\">What&#8217;s Next<\/h2>\n\n\n\n<p>In May, the focus will shift to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Continuing fa\u00e7ade works and starting balcony installations.<\/li>\n\n\n\n<li>Completing MEP works and commissioning across the upper levels.<\/li>\n\n\n\n<li>Advancing internal fit-outs on levels 4 and 5, plus ongoing snagging.<\/li>\n\n\n\n<li>Finalising lift commissioning.<\/li>\n\n\n\n<li>Beginning scaffold removal and preparing for landscaping phases.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"725\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkely-Square-Manchester-April-2025-South-Terrace-1024x725.jpg\" alt=\"A photo of Berkely Square Manchester - April 2025 - South Terrace\" class=\"wp-image-6617\" style=\"width:667px;height:auto\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkely-Square-Manchester-April-2025-South-Terrace-1024x725.jpg 1024w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkely-Square-Manchester-April-2025-South-Terrace-300x212.jpg 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkely-Square-Manchester-April-2025-South-Terrace-768x544.jpg 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkely-Square-Manchester-April-2025-South-Terrace-18x12.jpg 18w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkely-Square-Manchester-April-2025-South-Terrace.jpg 1389w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">South Terrace<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-design-and-quality\">Design and Quality<\/h2>\n\n\n\n<p>Design updates include roof details, access routes, and wayfinding signage. Safety remains a priority with no major incidents, though minor audit actions are being addressed. Quality checks continue across all trades, ensuring standards remain high.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-looking-ahead\">Looking Ahead<\/h2>\n\n\n\n<p>Despite the power connection delay, Berkeley Square Manchester continues to push forward. With fit-outs progressing and balconies on the horizon, we\u2019re heading into an exciting phase.<\/p>\n\n\n\n<p><strong>Stay tuned for more updates.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-center\" id=\"h-speak-to-us\">Speak to us!<\/h4>\n\n\n\n<p class=\"has-text-align-center\">For more information on <a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Berkeley Square Manchester<\/a>, check out our dedicated page:<br><br><a href=\"https:\/\/heatongroup.co.uk\/developments\/tranquillity-manchester\/\"><\/a><a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Berkeley Square Manchester<\/a><\/p>\n\n\n\n<p class=\"has-text-align-center\">Feel free to contact us directly at:<\/p>\n\n\n\n<p class=\"has-text-align-center\">01942 931300\u00a0\/\/<a href=\"mailto:sales@heatongroup.co.uk\">\u00a0sales@heatongroup.co.uk<\/a>\u00a0\/\/ <a href=\"https:\/\/meetings.hubspot.com\/robert-herring\/investment-team-scheduler\">Schedule a Call<\/a> \/\/ <a href=\"https:\/\/meetings.hubspot.com\/robert-herring\/berkeley-square-visit\">Book a Viewing<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>April has seen steady progress across Berkeley Square Manchester, with the team keeping things on track and five weeks ahead of schedule. While some external challenges have pushed back the power connection, plenty of work is being completed inside and out. What&#8217;s Been Happening What&#8217;s Next In May, the focus will shift to: Design and [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":6616,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"content-type":"","footnotes":""},"class_list":["post-6615","build-updates","type-build-updates","status-publish","format-standard","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3.1 (Yoast SEO v25.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Berkeley Square April 2025 Update | The Heaton Group<\/title>\n<meta name=\"description\" content=\"Berkeley Square Manchester stays ahead of schedule with fit-outs, fa\u00e7ade progress, and lift commissioning, despite a delayed power connection. April update inside.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-april-2025-update\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Berkeley Square April 2025 Update\" \/>\n<meta property=\"og:description\" content=\"Berkeley Square Manchester stays ahead of schedule with fit-outs, fa\u00e7ade progress, and lift commissioning, despite a delayed power connection. April update inside.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-april-2025-update\/\" \/>\n<meta property=\"og:site_name\" content=\"Property Development &amp; Buy to Let Property | The Heaton Group\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/theheatongroup\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-28T12:23:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkeley-Square-April-2025-Update.png\" \/>\n\t<meta property=\"og:image:width\" content=\"602\" \/>\n\t<meta property=\"og:image:height\" content=\"392\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@theheatongroup\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/\",\"url\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/\",\"name\":\"Berkeley Square April 2025 Update | The Heaton Group\",\"isPartOf\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkeley-Square-April-2025-Update.png\",\"datePublished\":\"2025-04-23T14:52:49+00:00\",\"dateModified\":\"2025-04-28T12:23:57+00:00\",\"description\":\"Berkeley Square Manchester stays ahead of schedule with fit-outs, fa\u00e7ade progress, and lift commissioning, despite a delayed power connection. April update inside.\",\"breadcrumb\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#primaryimage\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkeley-Square-April-2025-Update.png\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkeley-Square-April-2025-Update.png\",\"width\":602,\"height\":392,\"caption\":\"A bird eye view of Berkeley Square Manchester in April 2025\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/heatongroup.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Build Updates\",\"item\":\"https:\/\/heatongroup.co.uk\/build-updates\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Berkeley Square April 2025 Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/heatongroup.co.uk\/#website\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"name\":\"Heaton Group\",\"description\":\"Property Development &amp; Buy to Let Property\",\"publisher\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/heatongroup.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\",\"name\":\"The Heaton Group\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"width\":716,\"height\":895,\"caption\":\"The Heaton Group\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/theheatongroup\",\"https:\/\/x.com\/theheatongroup\",\"https:\/\/www.instagram.com\/theheatongroup\/\",\"https:\/\/www.tiktok.com\/@heaton.group\",\"https:\/\/www.linkedin.com\/company\/heaton-group\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Berkeley Square April 2025 Update | The Heaton Group","description":"Berkeley Square Manchester stays ahead of schedule with fit-outs, fa\u00e7ade progress, and lift commissioning, despite a delayed power connection. April update inside.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-april-2025-update\/","og_locale":"ar_AR","og_type":"article","og_title":"Berkeley Square April 2025 Update","og_description":"Berkeley Square Manchester stays ahead of schedule with fit-outs, fa\u00e7ade progress, and lift commissioning, despite a delayed power connection. April update inside.","og_url":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-april-2025-update\/","og_site_name":"Property Development &amp; Buy to Let Property | The Heaton Group","article_publisher":"https:\/\/www.facebook.com\/theheatongroup","article_modified_time":"2025-04-28T12:23:57+00:00","og_image":[{"width":602,"height":392,"url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkeley-Square-April-2025-Update.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@theheatongroup","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"3 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/","url":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/","name":"Berkeley Square April 2025 Update | The Heaton Group","isPartOf":{"@id":"https:\/\/heatongroup.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#primaryimage"},"image":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#primaryimage"},"thumbnailUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkeley-Square-April-2025-Update.png","datePublished":"2025-04-23T14:52:49+00:00","dateModified":"2025-04-28T12:23:57+00:00","description":"Berkeley Square Manchester stays ahead of schedule with fit-outs, fa\u00e7ade progress, and lift commissioning, despite a delayed power connection. April update inside.","breadcrumb":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#primaryimage","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkeley-Square-April-2025-Update.png","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2025\/04\/Berkeley-Square-April-2025-Update.png","width":602,"height":392,"caption":"A bird eye view of Berkeley Square Manchester in April 2025"},{"@type":"BreadcrumbList","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-april-2025-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/heatongroup.co.uk\/"},{"@type":"ListItem","position":2,"name":"Build Updates","item":"https:\/\/heatongroup.co.uk\/build-updates\/"},{"@type":"ListItem","position":3,"name":"Berkeley Square April 2025 Update"}]},{"@type":"WebSite","@id":"https:\/\/heatongroup.co.uk\/#website","url":"https:\/\/heatongroup.co.uk\/","name":"Heaton Group","description":"Property Development &amp; Buy to Let Property","publisher":{"@id":"https:\/\/heatongroup.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/heatongroup.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/heatongroup.co.uk\/#organization","name":"The Heaton Group","url":"https:\/\/heatongroup.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","width":716,"height":895,"caption":"The Heaton Group"},"image":{"@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/theheatongroup","https:\/\/x.com\/theheatongroup","https:\/\/www.instagram.com\/theheatongroup\/","https:\/\/www.tiktok.com\/@heaton.group","https:\/\/www.linkedin.com\/company\/heaton-group"]}]}},"_links":{"self":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/6615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates"}],"about":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/types\/build-updates"}],"author":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/comments?post=6615"}],"version-history":[{"count":4,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/6615\/revisions"}],"predecessor-version":[{"id":6876,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/6615\/revisions\/6876"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media\/6616"}],"wp:attachment":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media?parent=6615"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}