{"id":5731,"date":"2024-08-29T10:48:18","date_gmt":"2024-08-29T09:48:18","guid":{"rendered":"https:\/\/heatongroup.co.uk\/?post_type=build-updates&#038;p=5731"},"modified":"2024-08-29T10:53:47","modified_gmt":"2024-08-29T09:53:47","slug":"berkeley-square-august-2024-update","status":"publish","type":"build-updates","link":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-august-2024-update\/","title":{"rendered":"Berkeley Square August Update"},"content":{"rendered":"\n<p><em>We\u2019re pleased to report that the Berkeley Square project is progressing well and on schedule. The project is in week 69 of 139, with completion anticipated in early 2026.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construction Progress<\/h2>\n\n\n\n<p>This past month has seen significant progress across several areas of the site:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>The Structural Framing System (SFS)<\/strong> has been installed up to level 5.<\/li>\n\n\n\n<li><strong>Window installations <\/strong>have reached level 4, steadily enclosing the building.<\/li>\n\n\n\n<li><strong>Fa\u00e7ade insulation<\/strong> and the render base coat have been applied at the lower and upper ground floor levels in preparation for the installation of mast climbers.<\/li>\n\n\n\n<li><strong>Roof finishes<\/strong> have been completed for the level 7 roof terrace and core 2, which marks a major milestone in the project\u2019s progress.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>Internally, the ground floor partitions have been completed, and work on level 1 is now underway. The MEP (Mechanical, Electrical, and Plumbing) teams are progressing well, with SVP\/RWP installations, electrical containment up to levels 4 and 5, and wiring, trunking, and ducting continuing across the site. Sprinkler pipework installation is also ongoing.<\/p>\n\n\n\n<p>The next steps include continuing the installation of SFS, windows, and brick slip fa\u00e7ade insulation. We\u2019ll also focus on completing the mast climber platform installation. Internal works will progress to the upper ground floor and levels 1 and 2, with first fix MEP installations and firestopping before ceiling closures. In addition, we\u2019ll begin flooring, kitchen, and joinery installations, as well as the lift installation.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"596\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Inside-2-1024x596.jpg\" alt=\"A photo of the inside of Berkeley Square being built\" class=\"wp-image-5734\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Inside-2-1024x596.jpg 1024w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Inside-2-300x175.jpg 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Inside-2-768x447.jpg 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Inside-2.jpg 1379w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Design Progress<\/h2>\n\n\n\n<p>Our design team has been actively refining key elements:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Updated apartment and bathroom layouts have been finalised.<\/li>\n\n\n\n<li>General Arrangement (GA) plans and elevations have been adjusted to reflect the latest construction progress.<\/li>\n\n\n\n<li>The fire and acoustic strategies have been reviewed and updated to ensure compliance with all safety regulations.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>We\u2019ve also made strides in the design of the fa\u00e7ade, with updated brick slip drawings currently under review. The solution for the substation column relocation has been finalised, switching from steel to concrete columns.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside-1-1024x685.jpg\" alt=\"A photo of the outside of Berkeley Square being built\" class=\"wp-image-5735\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside-1-1024x685.jpg 1024w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside-1-300x201.jpg 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside-1-768x514.jpg 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside-1.jpg 1368w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-utility-update\">Utility Update<\/h2>\n\n\n\n<p>Utility connections are progressing steadily:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Electricity:<\/strong> The point of connection has been accepted, with orders being processed.<\/li>\n\n\n\n<li><strong>Water:<\/strong> The connection has been established at Ordsall Lane, with LEEP appointed as the asset owner.<\/li>\n\n\n\n<li><strong>Telecoms:<\/strong> The site is registered with Openreach, and duct connections are underway.<\/li>\n\n\n\n<li><strong>Drainage:<\/strong> The foul connection has been made, with storm drainage awaiting final agreement with Peel.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-health-amp-safety\">Health &amp; Safety<\/h2>\n\n\n\n<p>Safety on site remains a priority. We\u2019re proud to report there were no RIDDOR incidents this month, and the site continues to operate with an average of 120 operatives daily.<\/p>\n\n\n\n<p>We\u2019ve included progress photos showcasing various levels and sections of the construction site.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-commercial-progress\">Commercial Progress<\/h2>\n\n\n\n<p>We\u2019ve placed orders for key trades, including site hoarding, CFA piling, and masonry, with other essential procurements ongoing.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-quality-assurance\">Quality Assurance<\/h2>\n\n\n\n<p>Quality inspections are ongoing across multiple areas, including concrete, SFS, windows, and MEP installations. <\/p>\n\n\n\n<p>Any defects, such as damaged glass or missing lightning protection connections, are being promptly addressed. The sample fa\u00e7ade panel has been approved, and the benchmark apartment is on track for completion by January 2025.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-developer-updates\">Developer Updates<\/h2>\n\n\n\n<p>The SD Fibre installation commenced on 16th August, with further updates awaited.<\/p>\n\n\n\n<p>As always, we\u2019ll inform you of our progress as we progress closer to completing the Berkeley Square development.<\/p>\n\n\n\n<p><strong>Stay tuned for more updates.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-center\" id=\"h-speak-to-us\">Speak to us!<\/h4>\n\n\n\n<p class=\"has-text-align-center\">For more information on&nbsp;<a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Berkeley Square<\/a>, check out our dedicated page:<br><br><a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Berkeley Square<\/a><\/p>\n\n\n\n<p class=\"has-text-align-center\">Feel free to contact us directly at:<\/p>\n\n\n\n<p class=\"has-text-align-center\">01942 931300&nbsp;\/\/<a href=\"mailto:sales@heatongroup.co.uk\">&nbsp;sales@heatongroup.co.uk<\/a>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We\u2019re pleased to report that the Berkeley Square project is progressing well and on schedule. The project is in week 69 of 139, with completion anticipated in early 2026. Construction Progress This past month has seen significant progress across several areas of the site: Internally, the ground floor partitions have been completed, and work on [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":5736,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"content-type":"","footnotes":""},"class_list":["post-5731","build-updates","type-build-updates","status-publish","format-standard","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3.1 (Yoast SEO v25.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Berkeley Square August Update | The Heaton Group<\/title>\n<meta name=\"description\" content=\"Keep up with the latest at Berkeley Square, Manchester. The August update showcases key progress and significant on-site developments.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-august-2024-update\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Berkeley Square August Update\" \/>\n<meta property=\"og:description\" content=\"Keep up with the latest at Berkeley Square, Manchester. The August update showcases key progress and significant on-site developments.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-august-2024-update\/\" \/>\n<meta property=\"og:site_name\" content=\"Property Development &amp; Buy to Let Property | The Heaton Group\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/theheatongroup\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-29T09:53:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside.png\" \/>\n\t<meta property=\"og:image:width\" content=\"602\" \/>\n\t<meta property=\"og:image:height\" content=\"382\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@theheatongroup\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/\",\"url\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/\",\"name\":\"Berkeley Square August Update | The Heaton Group\",\"isPartOf\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside.png\",\"datePublished\":\"2024-08-29T09:48:18+00:00\",\"dateModified\":\"2024-08-29T09:53:47+00:00\",\"description\":\"Keep up with the latest at Berkeley Square, Manchester. The August update showcases key progress and significant on-site developments.\",\"breadcrumb\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#primaryimage\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside.png\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside.png\",\"width\":602,\"height\":382,\"caption\":\"A photo of Berkeley Square during the build phase on a hot August day\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/heatongroup.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Build Updates\",\"item\":\"https:\/\/heatongroup.co.uk\/build-updates\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Berkeley Square August Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/heatongroup.co.uk\/#website\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"name\":\"Heaton Group\",\"description\":\"Property Development &amp; Buy to Let Property\",\"publisher\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/heatongroup.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\",\"name\":\"The Heaton Group\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"width\":716,\"height\":895,\"caption\":\"The Heaton Group\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/theheatongroup\",\"https:\/\/x.com\/theheatongroup\",\"https:\/\/www.instagram.com\/theheatongroup\/\",\"https:\/\/www.tiktok.com\/@heaton.group\",\"https:\/\/www.linkedin.com\/company\/heaton-group\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Berkeley Square August Update | The Heaton Group","description":"Keep up with the latest at Berkeley Square, Manchester. The August update showcases key progress and significant on-site developments.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-august-2024-update\/","og_locale":"ar_AR","og_type":"article","og_title":"Berkeley Square August Update","og_description":"Keep up with the latest at Berkeley Square, Manchester. The August update showcases key progress and significant on-site developments.","og_url":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-august-2024-update\/","og_site_name":"Property Development &amp; Buy to Let Property | The Heaton Group","article_publisher":"https:\/\/www.facebook.com\/theheatongroup","article_modified_time":"2024-08-29T09:53:47+00:00","og_image":[{"width":602,"height":382,"url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@theheatongroup","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"4 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/","url":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/","name":"Berkeley Square August Update | The Heaton Group","isPartOf":{"@id":"https:\/\/heatongroup.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#primaryimage"},"image":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#primaryimage"},"thumbnailUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside.png","datePublished":"2024-08-29T09:48:18+00:00","dateModified":"2024-08-29T09:53:47+00:00","description":"Keep up with the latest at Berkeley Square, Manchester. The August update showcases key progress and significant on-site developments.","breadcrumb":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#primaryimage","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside.png","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/08\/Berkeley-Square-August-2024-Update-Outside.png","width":602,"height":382,"caption":"A photo of Berkeley Square during the build phase on a hot August day"},{"@type":"BreadcrumbList","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-august-2024-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/heatongroup.co.uk\/"},{"@type":"ListItem","position":2,"name":"Build Updates","item":"https:\/\/heatongroup.co.uk\/build-updates\/"},{"@type":"ListItem","position":3,"name":"Berkeley Square August Update"}]},{"@type":"WebSite","@id":"https:\/\/heatongroup.co.uk\/#website","url":"https:\/\/heatongroup.co.uk\/","name":"Heaton Group","description":"Property Development &amp; Buy to Let Property","publisher":{"@id":"https:\/\/heatongroup.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/heatongroup.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/heatongroup.co.uk\/#organization","name":"The Heaton Group","url":"https:\/\/heatongroup.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","width":716,"height":895,"caption":"The Heaton Group"},"image":{"@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/theheatongroup","https:\/\/x.com\/theheatongroup","https:\/\/www.instagram.com\/theheatongroup\/","https:\/\/www.tiktok.com\/@heaton.group","https:\/\/www.linkedin.com\/company\/heaton-group"]}]}},"_links":{"self":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/5731","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates"}],"about":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/types\/build-updates"}],"author":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/comments?post=5731"}],"version-history":[{"count":6,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/5731\/revisions"}],"predecessor-version":[{"id":5742,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/5731\/revisions\/5742"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media\/5736"}],"wp:attachment":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media?parent=5731"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}