{"id":5519,"date":"2024-07-31T11:10:03","date_gmt":"2024-07-31T10:10:03","guid":{"rendered":"https:\/\/heatongroup.co.uk\/?post_type=build-updates&#038;p=5519"},"modified":"2024-08-29T10:24:50","modified_gmt":"2024-08-29T09:24:50","slug":"berkeley-square-july-2024-update","status":"publish","type":"build-updates","link":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-july-2024-update\/","title":{"rendered":"Berkeley Square July Update"},"content":{"rendered":"\n<p><em>Welcome to our latest update on the Berkeley Square West Block Phase 1 development! We\u2019re excited to share the progress we&#8217;ve made and provide a glimpse of what\u2019s coming up next.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Construction Progress<\/h2>\n\n\n\n<p>Over the last reporting period, we have achieved several significant milestones:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Concrete Work:<\/strong> Completed concrete frame floor slabs and parapets.<\/li>\n\n\n\n<li><strong>Wall Masonry:<\/strong> Finished perimeter external wall masonry, except for the face brick up to DPC.<\/li>\n\n\n\n<li><strong>Windows and Fa\u00e7ade:<\/strong> We have progressed the SFS installation up to level 4 and the windows up to level 3. Fa\u00e7ade insulation and render base coat are ongoing, and mast climbers have been installed.<\/li>\n\n\n\n<li><strong>Roof Finishes:<\/strong> Laid roof finishes on part of the level 6 roof terrace and core 1 roof.<\/li>\n\n\n\n<li><strong>Internal Partitions:<\/strong> Commenced on the upper ground floor.<\/li>\n\n\n\n<li><strong>MEP Work:<\/strong> We have continued SVP\/RWP installation and electrical containment, with wiring and ducting in progress. We have also installed sprinkler pipework on the lower ground floor.<\/li>\n\n\n\n<li><strong>Soffit Insulation:<\/strong> Completed in the lower ground floor area, except for hoist areas.<\/li>\n\n\n\n<li><strong>Power Milestone:<\/strong> Temporary power to be used for apartment lighting and commissioning due to connection issues.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>Looking ahead, our planned activities include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Continuation of SFS, Windows, and Fa\u00e7ade Work:<\/strong> Ongoing installation with Mastclimber platform.<\/li>\n\n\n\n<li><strong>MEP Containment and Pipework:<\/strong> Further installation to risers and residential floors.<\/li>\n\n\n\n<li><b>Internal Partitions and Firestopping: <\/b>Continue partitions on the upper ground floor, followed by first fixing MEP and fire stopping before closing up ceilings.<\/li>\n\n\n\n<li><strong>Roof Finishes:<\/strong> Complete finishes above all cores and hot melt roof finishes to levels 6 and 7.<\/li>\n\n\n\n<li><strong>Roof Terrace Balustrade:<\/strong> Commence installation of balustrade posts.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"759\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-2-July-2024-1024x759.png\" alt=\"A photo of Berkeley Square during its build phase\" class=\"wp-image-5522\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-2-July-2024-1024x759.png 1024w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-2-July-2024-300x222.png 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-2-July-2024-768x570.png 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-2-July-2024.png 1227w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Design Progress<\/h2>\n\n\n\n<p>We\u2019ve made significant updates to our design elements:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Updated partition drawings<\/li>\n\n\n\n<li>Revised apartment and bathroom settings<\/li>\n\n\n\n<li>Detailed fa\u00e7ade layout<\/li>\n\n\n\n<li>Internal door jamb details<\/li>\n\n\n\n<li>Mechanical services fire safety layouts and panel heater layouts<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"762\" src=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-4-July-2024-1024x762.png\" alt=\"A photo of Berkeley Square during its build phase\" class=\"wp-image-5520\" srcset=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-4-July-2024-1024x762.png 1024w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-4-July-2024-300x223.png 300w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-4-July-2024-768x572.png 768w, https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-4-July-2024.png 1232w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-utility-update\">Utility Update<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Electricity:<\/strong> Connection accepted from LEEP; AMEON order being processed.<\/li>\n\n\n\n<li><strong>Water:<\/strong> Connection in Ordsall Lane, with LEEP appointed as the asset owner.<\/li>\n\n\n\n<li><strong>Telecom:<\/strong> Site registered, and Open Reach is connecting ducts to their chambers.<\/li>\n\n\n\n<li><strong>Drainage:<\/strong> Foul connection made, with storm connections pending final agreements.<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>We\u2019ve included progress photos showcasing various levels and sections of the construction site.<\/p>\n\n\n\n<p><strong>Stay tuned for more updates.<\/strong><\/p>\n\n\n\n<h4 class=\"wp-block-heading has-text-align-center\" id=\"h-speak-to-us\">Speak to us!<\/h4>\n\n\n\n<p class=\"has-text-align-center\">For more information on&nbsp;<a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Berkeley Square<\/a>, check out our dedicated page:<br><br><a href=\"https:\/\/heatongroup.co.uk\/developments\/berkeley-square\/\">Berkeley Square<\/a><\/p>\n\n\n\n<p class=\"has-text-align-center\">Feel free to contact us directly at:<\/p>\n\n\n\n<p class=\"has-text-align-center\">01942 931300&nbsp;\/\/<a href=\"mailto:sales@heatongroup.co.uk\">&nbsp;sales@heatongroup.co.uk<\/a>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Welcome to our latest update on the Berkeley Square West Block Phase 1 development! We\u2019re excited to share the progress we&#8217;ve made and provide a glimpse of what\u2019s coming up next. Construction Progress Over the last reporting period, we have achieved several significant milestones: Looking ahead, our planned activities include: Design Progress We\u2019ve made significant [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":5521,"comment_status":"open","ping_status":"open","template":"","format":"standard","meta":{"content-type":"","footnotes":""},"class_list":["post-5519","build-updates","type-build-updates","status-publish","format-standard","has-post-thumbnail","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3.1 (Yoast SEO v25.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Berkeley Square July Update | The Heaton Group<\/title>\n<meta name=\"description\" content=\"Stay updated with the latest progress at Berkeley Square, Manchester. Our July update reveals important progress made.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-july-2024-update\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Berkeley Square July Update\" \/>\n<meta property=\"og:description\" content=\"Stay updated with the latest progress at Berkeley Square, Manchester. Our July update reveals important progress made.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-july-2024-update\/\" \/>\n<meta property=\"og:site_name\" content=\"Property Development &amp; Buy to Let Property | The Heaton Group\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/theheatongroup\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-29T09:24:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-3-July-2024.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1234\" \/>\n\t<meta property=\"og:image:height\" content=\"922\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@theheatongroup\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 \u062f\u0642\u0627\u0626\u0642\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/\",\"url\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/\",\"name\":\"Berkeley Square July Update | The Heaton Group\",\"isPartOf\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-3-July-2024.png\",\"datePublished\":\"2024-07-31T10:10:03+00:00\",\"dateModified\":\"2024-08-29T09:24:50+00:00\",\"description\":\"Stay updated with the latest progress at Berkeley Square, Manchester. Our July update reveals important progress made.\",\"breadcrumb\":{\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#primaryimage\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-3-July-2024.png\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-3-July-2024.png\",\"width\":1234,\"height\":922,\"caption\":\"A photo of Berkeley Square during its build phase\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/heatongroup.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Build Updates\",\"item\":\"https:\/\/heatongroup.co.uk\/build-updates\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Berkeley Square July Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/heatongroup.co.uk\/#website\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"name\":\"Heaton Group\",\"description\":\"Property Development &amp; Buy to Let Property\",\"publisher\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/heatongroup.co.uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/heatongroup.co.uk\/#organization\",\"name\":\"The Heaton Group\",\"url\":\"https:\/\/heatongroup.co.uk\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"contentUrl\":\"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg\",\"width\":716,\"height\":895,\"caption\":\"The Heaton Group\"},\"image\":{\"@id\":\"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/theheatongroup\",\"https:\/\/x.com\/theheatongroup\",\"https:\/\/www.instagram.com\/theheatongroup\/\",\"https:\/\/www.tiktok.com\/@heaton.group\",\"https:\/\/www.linkedin.com\/company\/heaton-group\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Berkeley Square July Update | The Heaton Group","description":"Stay updated with the latest progress at Berkeley Square, Manchester. Our July update reveals important progress made.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-july-2024-update\/","og_locale":"ar_AR","og_type":"article","og_title":"Berkeley Square July Update","og_description":"Stay updated with the latest progress at Berkeley Square, Manchester. Our July update reveals important progress made.","og_url":"https:\/\/heatongroup.co.uk\/ar\/build-updates\/berkeley-square-july-2024-update\/","og_site_name":"Property Development &amp; Buy to Let Property | The Heaton Group","article_publisher":"https:\/\/www.facebook.com\/theheatongroup","article_modified_time":"2024-08-29T09:24:50+00:00","og_image":[{"width":1234,"height":922,"url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-3-July-2024.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@theheatongroup","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"3 \u062f\u0642\u0627\u0626\u0642"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/","url":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/","name":"Berkeley Square July Update | The Heaton Group","isPartOf":{"@id":"https:\/\/heatongroup.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#primaryimage"},"image":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#primaryimage"},"thumbnailUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-3-July-2024.png","datePublished":"2024-07-31T10:10:03+00:00","dateModified":"2024-08-29T09:24:50+00:00","description":"Stay updated with the latest progress at Berkeley Square, Manchester. Our July update reveals important progress made.","breadcrumb":{"@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#primaryimage","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-3-July-2024.png","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/07\/Berkeley-Square-3-July-2024.png","width":1234,"height":922,"caption":"A photo of Berkeley Square during its build phase"},{"@type":"BreadcrumbList","@id":"https:\/\/heatongroup.co.uk\/build-updates\/berkeley-square-july-2024-update\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/heatongroup.co.uk\/"},{"@type":"ListItem","position":2,"name":"Build Updates","item":"https:\/\/heatongroup.co.uk\/build-updates\/"},{"@type":"ListItem","position":3,"name":"Berkeley Square July Update"}]},{"@type":"WebSite","@id":"https:\/\/heatongroup.co.uk\/#website","url":"https:\/\/heatongroup.co.uk\/","name":"Heaton Group","description":"Property Development &amp; Buy to Let Property","publisher":{"@id":"https:\/\/heatongroup.co.uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/heatongroup.co.uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/heatongroup.co.uk\/#organization","name":"The Heaton Group","url":"https:\/\/heatongroup.co.uk\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/","url":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","contentUrl":"https:\/\/heatongroup.co.uk\/wp-content\/uploads\/2024\/02\/Heaton_Group_House_Logo_Light.jpg","width":716,"height":895,"caption":"The Heaton Group"},"image":{"@id":"https:\/\/heatongroup.co.uk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/theheatongroup","https:\/\/x.com\/theheatongroup","https:\/\/www.instagram.com\/theheatongroup\/","https:\/\/www.tiktok.com\/@heaton.group","https:\/\/www.linkedin.com\/company\/heaton-group"]}]}},"_links":{"self":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/5519","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates"}],"about":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/types\/build-updates"}],"author":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/comments?post=5519"}],"version-history":[{"count":4,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/5519\/revisions"}],"predecessor-version":[{"id":5528,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/build-updates\/5519\/revisions\/5528"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media\/5521"}],"wp:attachment":[{"href":"https:\/\/heatongroup.co.uk\/ar\/wp-json\/wp\/v2\/media?parent=5519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}